Skip to content

Design Checklist

How to use this

Start only after Data & Strategy has handed over an approved brief. Work top to bottom and hand Build one approved version. Progress is saved in this browser on this device and is not shared.

Use this checklist to turn the approved campaign angle into complete, reviewable, build-ready assets without redefining the strategy or measurement plan.

  1. 1. Accept the brief

    Required output: A design-ready brief with no unresolved strategic dependencies.

  2. 2. Prepare the Figma file

    Reference example: KK: Round 1 CRO A/B Test Design

    Required output: A consistently organized Figma file with all six pages ready for the campaign design work.

  3. 3. Map the campaign experience

    Required output: An approved experience map showing how every surface supports the same campaign angle.

  4. 4. Design the variants and states

    Required output: Complete designs for every in-scope surface and required state.

  5. 5. Review quality and accessibility

    Required output: An internally reviewed design with documented issues resolved.

  6. 6. Secure approval

    Required output: One approved version that Build can implement without choosing between competing files or comments.

  7. 7. Hand off to Build

    Handoff gate: Build has final assets and copy, explicit behavior and states, tracking requirements, and testable acceptance criteria.

Continue to Build & Launch